We can assist you through your entire project – from initial consultancy and design, all the way to completed construction. Here you'll find a selection of our completed and ongoing projects.
Københavns Energi wanted a 4 kilometre long tunnel built 30-40 metres under the city in a limestone seam.
Read more about the project
For 20 years MT Højgaard has been fireproofing steel constructions at Statoil in Kalundborg, including a 30 metre high production plant.
Safety was given highest priority when we built Kløvermarken Gasworks, which supplies Copenhagen with a new and more environmentally-friendly town gas.
There were plenty of challenges when MT Højgaard constructed the new reception plant for solid chemical waste for Kommunekemi in Nyborg.
Fertiliser group Yara wanted a 53 metre high silo built at its factory in the Swedish town of Köping. MT Højgaard was chosen for the task.
When the bridge at Borrevejle Vig in Roskilde Fjord needed replacement, MT Højgaard had to think of alternative solutions and chose to cut the bridge away.
An old protective core at Risø National Laboratory for Sustainable Energy had to be removed in 2007. MT Højgaard developed a special method of drilling.
A machine foundation consisting of three large concrete blocks and a combined heat and power plant had to be cut up and removed in 2007.
An old emergency shelter in the town hall's basement was rebuilt into offices while the town hall remained in operation.
In a joint venture with the Faroese company J & K Petersen we have signed a new contract for carrying out the tunnel "Eiði 2 South".
We replaced 125,000 square metres of asphalt surfacing on the taxiways at Thule Air Base. The materials were obtained from a nearby quarry and crushed locally.
Reconstruction of seven harbours located on six different islands of the Maldives.
New jetty in Qatar constructed by MT Højgaard back in 2008.
The project includes construction of both a commercial port and a basin for fishing vessels.
Towards better health and growth: Drainage and sanitation project carried out in Bac Giang city in Vietnam.
New hydroelectric power plant being established in Bocas del Toro, Panama by Pihl and MT Højgaard.
The construction of 6,800 meters pipe intake for a power plant in Qatar was carried out in 2009.
In the bank, low energy consumption is ensured, which is good news for the both the environment and for the bank's running costs.
KPMG's head office is sustainable and has been given Green Building certification. It was constructed in an environmentally friendly way.