Projects

Combined-heat-and-powerplants

District heating tunnel, Amager Power Station

Københavns Energi wanted a 4 kilometre long tunnel built 30-40 metres under the city in a limestone seam.

Read more about the project

Combined-heat-and-powerplants

Fireproofing at Statoil

For 20 years MT Højgaard has been fireproofing steel constructions at Statoil in Kalundborg, including a 30 metre high production plant.

Read more about the project

Combined-heat-and-powerplants

Kløvermarken Gasworks

Safety was given highest priority when we built Kløvermarken Gasworks, which supplies Copenhagen with a new and more environmentally-friendly town gas.

Read more about the project

Combined-heat-and-powerplants

New plant for chemical waste in Nyborg

There were plenty of challenges when MT Højgaard constructed the new reception plant for solid chemical waste for Kommunekemi in Nyborg.

Read more about the project

Combined-heat-and-powerplants

Slip form casting of a 53 metre high silo

Fertiliser group Yara wanted a 53 metre high silo built at its factory in the Swedish town of Köping. MT Højgaard was chosen for the task.

Read more about the project

Drilling-cutting

Borrevejle Vig

When the bridge at Borrevejle Vig in Roskilde Fjord needed replacement, MT Højgaard had to think of alternative solutions and chose to cut the bridge away.

Read more about the project

Drilling-cutting

Risø National Laboratory for Sustainable Energy

An old protective core at Risø National Laboratory for Sustainable Energy had to be removed in 2007. MT Højgaard developed a special method of drilling.

Read more about the project

Drilling-cutting

Wire cutting at Amager Power Station

A machine foundation consisting of three large concrete blocks and a combined heat and power plant had to be cut up and removed in 2007.

Read more about the project

Drilling-cutting

Wire cutting at Frederiksværk Town Hall

An old emergency shelter in the town hall's basement was rebuilt into offices while the town hall remained in operation.

Read more about the project

International

Eidi 2, drilled tunnel, Skala

In a joint venture with the Faroese company J & K Petersen we have signed a new contract for carrying out the tunnel "Eiði 2 South".

Read more about the project

Infrastructure

Thule Air Base

We replaced 125,000 square metres of asphalt surfacing on the taxiways at Thule Air Base. The materials were obtained from a nearby quarry and crushed locally.

Read more about the project

Marine-Works

Maldives Tsunami Reconstruction Project

Reconstruction of seven harbours located on six different islands of the Maldives.

Read more about the project

Marine-Works

Construction of New Jetty

New jetty in Qatar constructed by MT Højgaard back in 2008.

Read more about the project

Marine-Works

Oluvil Port Development Project

The project includes construction of both a commercial port and a basin for fishing vessels.

Read more about the project

Drainage and sanitation project

Drainage and sanitation project

Towards better health and growth: Drainage and sanitation project carried out in Bac Giang city in Vietnam.

Read more about the project

Marine-Works

Hydropower Plant

New hydroelectric power plant being established in Bocas del Toro, Panama by Pihl and MT Højgaard.

Read more about the project

Marine-Works

Iberdrola Water Intake

The construction of 6,800 meters pipe intake for a power plant in Qatar was carried out in 2009.

Read more about the project

Domiciles

Brørup Savings Bank

In the bank, low energy consumption is ensured, which is good news for the both the environment and for the bank's running costs.

Read more about the project

KPMG

KPMG's head office is sustainable and has been given Green Building certification. It was constructed in an environmentally friendly way.

Read more about the project