In a joint venture with the Faroese company J & K Petersen we have signed a new contract for carrying out the tunnel "Eiði 2 South".
Read more about the project
We replaced 125,000 square metres of asphalt surfacing on the taxiways at Thule Air Base. The materials were obtained from a nearby quarry and crushed locally.