MT Højgaard has designed, supplied and installed the 25 foundations for the Rhyl Flats Offshore Wind Farm located at the North Wales Coast in the United Kingdom.

The design and fabrication works for the foundations took place during the second half of 2007, and installation of the foundations was carried out during the spring/summer of 2008.

Design and installation of the foundations are based on the traditional monopile concept with a large-diameter tubular steel pile inserted in the ground and a steel transition piece, with a standard flange connection to the turbine tower, placed and grouted on top/around of the monopile.

All the foundations were temporarily stored at Mostyn harbour. After insertion of plugs the monopiles were floated to site. The transition pieces were transported to site on barges. Installation of the foundations took place by the use of the large floating crane "Svanen"

MT Højgaard participates at EWEA OFFSHORE 2011

The world's largest offshore wind energy event is held in Amsterdam from 29 November to 1 December.

Read more

Energy

Middelgrunden Offshore Wind Farm

20 foundations for wind turbines on the bank of Oresund close to Copenhagen Harbour supplied and installed in 2000.

Read more about the project

Energy

Lynn and Inner Dowsing Offshore Wind Farms

54 foundations on the Lynn & Inner Dowsing sites located on the east coast of England installed by MT Højgaard in 2007.

Read more about the project