To top

Contemporary learning environment with flexible and appealing design

MT Højgaard joined forces with DEAS in a Public-Private Collaboration (PPC) and created the Skovbakke School in Odder. The school will accommodate 650 pupils and staff with a day-care facility with space for 100 children. The school provides a modern and flexible framework for learning, movement, and communal activities.

For more information
Contact us

Project Details

Project Name

Skovbakke School

Status

Finished

Type

Design and engineering, Steel, Education and research, ESG

City

Customer

Public sector contracting entity: Odder Municipality. Client: PPC Skovbakkeskolen by DEAS and MT Højgaard

Collaborators

The school covers 9,300m2 over two floors and will house a primary, middle and senior school with classrooms, a sports hall and day-care facility.

The school is characterised by its complex zig-zag roof geometry, varying façade and large assembly hall, which will be the heart of the school. We have placed two windows in the assembly hall and two skylights in the wings.

Operation and maintenance for 25 years

MT Højgaard has built Skovbakke School as part of a Public-Private Collaboration (PPC) with DEAS. Together, we will be responsible for the operation and maintenance of the school for 25 years.

PPCs are a good and long-term solution for school projects and, at MT Højgaard, we have entered into similar partnerships with Nordstjernen School in Frederikshavn and Vildbjerg School in Vildbjerg.

The school covers 9,300 m2 distributed on to floors and accommodates 650 pupils and personal as well as 100 children in the day-care facility.

Complicated steel structures

As part of the Skovbakke School project, MT Højgaard has handled the design. In this respect, we have been responsible for every engineering discipline, from structural design, plumbing and electrical installations, to fire protection, sustainability, and geotechnics.

Right from the outset and through to the design and execution, there is clear focus on optimising the subsequent operation of the buildings. 3D design has been employed, including collision control, which ensures buildability and error-free construction and installations.

During the detailed dimensioning of the load-bearing structures, we used the latest calculation software, while for the large and complicated steel roof structures we used the ROBOT design tool.

MT Højgaard is handling every engineering discipline, from structural design, plumbing and electrical installations, to fire protection, sustainability and geotechnics.

MT Højgaard built Skovbakke School as part of a Public-Private Collaboration (PPC) with DEAS.

Building while the school is operational

The whole of the existing school was progressively demolished while we built the new one. This means that the school remained operational while MT Højgaard executed the construction phase. We divided this into two stages for the sake of all the individuals whose daily lives are entwined with the school.

During the first stage we demolished part of the school while teaching continued in the other buildings. When this stage was completed, we began demolishing the rest in order to build the day-care centre and complete all exterior areas.

Windows in the assembly hall

One of the most exciting tasks in building Skovbakke School has been to create the load-bearing inner walls and steel structures with light façade elements and roof cassettes that characterise the school.

Lockers in the Skovbakke School in Odder.

Sustainability

The school conforms to energy class 2020, and was built with a focus on sustainability, the indoor climate and durable solutions.

To top

This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies. Read more about cookies

You are now leaving MT Højgaard's website to visit MT Højgaard Holding website