56 Bridges between Ringsted and Fehmarn
Scandinavia and the rest of Europe brought closer together with major upgrade of the railway line from Ringsted to Fehmarn

56 Bridges between Ringsted and Fehmarn
The railway line will result in a faster journey time between Copenhagen and Hamburg, switch freight and travellers from road to rail and cut CO2 emissions. The project consisted of a total of 20 bridge constructions, built either as concrete frames cast in situ or as prefabricated elements. This ensured a fast replacement of the existing structures.
Interdisciplinary design
During the design of the many bridges, MT Højgaard brought all its engineering disciplines to bear including, civil engineering, soil engineering, drainage, earthworks and surveying as well as temporary structures.
The project comprised eight existing railway bridges, which have been widened, nine rail bridge were executed as pre-fabricated elements, two footpath tunnels and a major retaining wall.
The widenings were constructed as frames cast in situ in order to achieve uniformity with the existing structures, while replacement of entire bridges were carried out using pre-fabricated elements to ensure rapid replacement in shorter track sections.
In addition to the load-bearing structures, the project also comprised the design of the track foundation surrounding the construction as well as the design of all the temporary retaining walls and scaffolding constructions.
3D Design
The project was planned using the latest 3D tools with ongoing collision control ensuring that the construction was feasible and coordinated. The 3D models were also used for ongoing quantity control.