New Aalborg University Hospital, MT Højgaard Danmark
The upper storeys are supported by pre-fabricated concrete pillars.
New Aalborg University Hospital, MT Højgaard Danmark

Digital aids from the outset

Right from the outset, MT Højgaard made use of VDC and BIM to create optimal conditions for the design and building of the university hospital. When tendering for the project, we supplied both traditional 2D drawings and delivered a 3D model of the buildings to create an overview.

After winning the project, we used models to verify the specifications of the tender. The client’s consultants had developed part models, which we integrated into an overall one, which was used to generate information and to visualise the project.

The digital tools have also proved to be of great assistance on site. MT Højgaard has a large transportable VDC laboratory, from where the work is coordinated and planned on a daily basis. We have linked the building model with a location-based timetable, which gives a strong visual overview, and where the timetable is continually updated in line with the status and manning of the project. 

When the hospital is finished it will measure 155,000 m2.
New Aalborg University Hospital, MT Højgaard Danmark

Shell with walls and floordecks cast in-situ

All walls at NAU are cast in situ in order to future proof NAU’s changing requirements.  The upper storeys are supported by pre-fabricated concrete pillars and in the three-storey buildings, the façades are designed as sandwich elements.
Throughout the execution of the project, there has been tight co-ordination in order to synthesise the many interfaces between the steel and concrete structures.

We will close the façade with rear wall elements in order to create the building envelope. A total of two million bricks will be laid at the base of the hospital, and all façade and brick work will be carried out in close co-ordination with other shell works.

All projects
All the walls at the new university hospital are cast in situ.
New Aalborg University Hospital, MT Højgaard Danmark
Digital tools optimise the process when MT Højgaard every day plans the work in a mobile VDC Lab.