Møn Bridge
Extensive repair of Møn Bridge (Queen Alexandrine Bridge) so that it can accommodate road and water traffic for many years to come.

Concrete renovation of Møn Bridge
Concrete renovation at the 750m bridge was carried out for the Danish Road Directorate, and was a massive undertaking. We renovated the entire upper surface of the bridge in the first stage and replaced edge beams and railings. Road and pavement surfaces were replaced with a 100mm layer of reinforced concrete, covered by a 7mm layer of artificial coating.
During the second stage, the concrete structures under the road deck were repaired where necessary, and the whole of the underside of the road deck was protected using a so-called svumme treatment.
Traffic on the bridge during the refurbishment work
In addition to the concrete renovation, we also undertook traffic control procedures as well as drilling and cutting works. One of the major challenges was that traffic across the bridge should continue to flow as usual, which meant that we could only work in one lane at a time. We installed traffic lights to enable vehicles to cross the bridge safely via the one accessible lane.